Procedures

Please note that once you have printed any of these documents it is an uncontrolled copy and valid only for the day on which it was printed. Please return to this website to verify content.

Number Title Last Updated Version
ANPR All Procedures (zip) 03 Dec 2023
ANPR Status Sheet 03 Dec 2023 9.1
ANPR 700 Using a Local Possession Authority 13 Dec 2021 3.2
ANPR 701 Using a Track Occupancy Authority 13 Dec 2021 3.2
ANPR 702 Using a Track Work Authority 23 Feb 2020 3.1
ANPR 703 Using Absolute Signal Blocking 23 Feb 2020 2.1
ANPR 704 Using Infrastructure Booking Advices 23 Feb 2020 2.1
ANPR 705 Removing 1500V Supply 11 Oct 2015 2.0
ANPR 706 Removing 1500V Supply in Electric Vehicle Maintenance Centres 11 Oct 2015 2.0
ANPR 707 Clipping Points 27 Oct 2019 3.1
ANPR 708 Using X, Y and Z Keys 11 Oct 2015 2.0
ANPR 709 Using Railway Track Signals 16 Sep 2018 2.1
ANPR 710 Piloting Trains and Track Vehicles 11 Oct 2015 2.0
ANPR 711 Lookouts 16 Jul 2021 3.2
ANPR 712 Protecting Work From Rail Traffic on Adjacent Tracks 23 Feb 2020 2.1
ANPR 713 Placing Temporary Speed Signs 16 Sep 2018 2.1
ANPR 714 Removing 1500V Supply in Unplanned Situations 11 Oct 2015 2.0
ANPR 715 Protecting Type F Level Crossings 23 Feb 2020 2.1
ANPR 716 On Site Testing of Type F Level Crossings 03 Dec 2023 2.1
ANPR 717 Using Emergency Roadside Warning Equipment 23 Feb 2020 2.1
ANPR 718 Remote Monitoring of Type F Level Crossing Equipment 11 Oct 2015 2.0
ANPR 719 Operating Ground Frames 11 Oct 2015 2.0
ANPR 720 Protecting Trains 11 Oct 2015 2.0
ANPR 721 Spoken and Written Communication 11 Oct 2015 2.0
ANPR 722 Manual Block Working 11 Oct 2015 2.0
ANPR 723 Using Block Posts 11 Oct 2015 2.0
ANPR 724 Using Clearance Locations 11 Oct 2015 2.0
ANPR 725 Using a Large Pilot Staff 11 Oct 2015 2.0
ANPR 726 Using Half Pilot Staffs 11 Oct 2015 3.0
ANPR 727 Using Crossovers for Special Working 11 Oct 2015 2.0
ANPR 728 Operating Emergency Crossovers 11 Oct 2015 3.0
ANPR 731 Using Train Staffs 11 Oct 2015 2.0
ANPR 732 Using Staff Contact Locks 11 Oct 2015 2.0
ANPR 737 Switching a signal box or local control panel in and out 11 Oct 2015 2.0
ANPR 738 Operating powered interlocking machines 11 Oct 2015 3.0
ANPR 739 Operating mechanical interlocking machines 11 Oct 2015 3.0
ANPR 740 Responding to faulty points 11 Oct 2015 2.0
ANPR 741 Manually operating electrohydraulic points 11 Oct 2015 2.0
ANPR 742 Manually operating cranked electric points 11 Oct 2015 2.0
ANPR 743 Manually operating handthrow electric points 30 Aug 2020 3.2
ANPR 745 Using non-interlocked points 16 Sep 2018 3.1
ANPR 746 Authorising rail traffic to pass an absolute signal at stop 11 Oct 2015 2.0
ANPR 747 Using drivers time release buttons 11 Oct 2015 2.0
ANPR 748 Transferring Track Vehicles 11 Oct 2015 2.0
ANPR 749 In Cab Activated Points System 08 Jun 2016 1.1
OPE-PR-003 Staging/Stabling Coal Trains within the ARTC Hunter Valley Network during Closedown Possessions  18 Aug 2016 2.0

Go to top