Network Configuration & Description

The Hunter Valley rail network covered by the 2021 HVAU includes the mainline standard gauge track linking Newcastle Ports (Pt Waratah, Kooragang, NCIG) – Turrawan (excluding Newcastle main lines), and Muswellbrook – Ulan. An illustrative map showing those parts of ARTC’s network covered by the undertaking is at Annexure 1 to Schedule B of the undertaking (see below).

This menu provides access to ARTC Network Maps and detailed information about Network configuration.

Illustrative map showing the Network – (Annexure 1 to Schedule B of the 2021 HVAU)

Here you will find an illustrative map showing a geographical description of the Network covered by the undertaking in the form of Annexure 1 to Schedule B of the undertaking as amended by ARTC from time to time. The precise details of the Network will change over the term of the undertaking but not in such a way as to be inconsistent with the textual descriptions of the Network in Schedule B of the undertaking.

Number Title Effective Posted
Network Map – Annexure 1 to Schedule B 30 Dec 2015 25 Mar 2015

Network Configuration

Go to top