- This event has passed.
Hunter Valley Maintenance Shutdown (NSW)
2018-09-18 @ 6:30 am - 2018-09-20 @ 10:00 pm
The Hunter Valley network will undergo major maintenance works as part of a scheduled shutdown of the network.
Works across the network will include track reconditioning and resurfacing, rail replacement, road and pedestrian level crossing improvements, rail bridge repairs and testing, ballast cleaning, vegetation control, rail corridor tidy-up work and signal maintenance.
The maintenance and improvement work in these scheduled shutdowns is critical to the on-going safety and reliability of the rail network.
Please note: times displayed are indicative of the entire network and can vary by project and location. If you would like to know more about upcoming works in your area please contact Enviroline on 1300 550 402 or email us at enviroline@ARTC.com.au