- This event has passed.
Hunter Valley Track Machine Program
2018-06-08 - 2018-06-12
This is to provide information specifically about track machines in the Hunter Valley (tamping, grinding and milling) and where they will be working between April to June 2018.
To maintain the track, the machines need to be constantly working around the network, including at night. We understand they can be loud and disruptive at times to our community. The machines look similar to trains but move at a slower pace, around 2-15km/hr and generally do not work in an area for very long.
As track machines work during both live operations and scheduled maintenance periods, it can be difficult to predict their exact location ahead of time.
April – June Track Machine Program | |||||
Location | April | May | June | ||
8th — 9th | 10th — 12th | 7th — 10th | 8th — 12th | 21st — 26th | |
Islington to Sandgate | X | X | |||
Sandgate to Maitland | X | X | X | X | |
Maitland to Muswellbrook | X | X | X | X | X |
Muswellbrook to Werris Creek | X | X | X | ||
Werris Creek to Gunnedah | X | X | |||
Gunnedah to Narrabri | X | X | X | ||
Muswellbrook to Ulan | X | X | X |
You can contact us on 1300 550 402 or email Enviroline@artc.com.au