Loading Events

« All Events

  • This event has passed.

Rail Maintenance Work – Albury/Wodonga

September 14 @ 6:00 am - September 16 @ 6:00 pm

We will be carrying out essential track maintenance and improvement works this September at the Murray River Bridge in Albury-Wodonga.

Works will commence daily at 6:00am and run until 6:00pm, from Saturday 14th September 2024 to Monday 16th September 2024.

There may be some traffic impacts, it will be noisy at times, and some dust may be generated. Please be assured that we will implement measures to manage and minimise these impacts on the community where possible.

We will turn off machinery when not in use, arrange work in stages and/or phase the equipment used at one time to reduce noise impacts where possible. The movement of materials and machinery on site may result in the generation of dust. We will take practical measures to reduce the amount of dust produced by our works where possible.

For more information, please contact our Community Line on 1300 550 402 or community@artc.com.au

 

Details

Start:
September 14 @ 6:00 am
End:
September 16 @ 6:00 pm
Event Category:

Go to top