Loading Events

« All Events

  • This event has passed.

Rail Maintenance Work, Tintinara SA, November/December 2024

2024-11-23 @ 9:00 am - 2024-12-06 @ 11:00 pm

We will be completing essential track maintenance and improvement works over the next few weeks at Tintinara.

Preparation works and material unloading will be conducted from Saturday 23rd to Tuesday 26th November 2024, between 9:00am and 7:00pm daily.

Civil works will then occur from Wednesday 27th November to Friday 6th December 2024 between 9:00am and 11:00pm daily.

How could this work affect you?

It will be noisy at times, there may be some extra traffic. Please be assured that we will implement measures to manage and minimize these impacts on the community where possible.

We will turn off machinery when not in use, arrange work in stages and/or phase the equipment used at one time to reduce noise impacts where possible. Light towers will face away from residents.

The movement of materials and machinery onsite may result in the generation of dust. We will take practical measures to reduce the amount of dust produced by our works where possible.

If you are affected by these works and would like to discuss further, please contact the ARTC Community Line at community@artc.com.au or 1300 550 402.

Details

Start:
2024-11-23 @ 9:00 am
End:
2024-12-06 @ 11:00 pm

Go to top