Loading Events

« All Events

  • This event has passed.

Rail Signalling Maintenance Work, Tallarook, Victoria, October/November 2024

2024-10-01 @ 7:00 am - 2024-11-15 @ 5:00 pm

We will be upgrading ARTC Signalling infrastructure near Dockery’s Road level crossing (south of Tallarook), Victoria.

The works will commence Tuesday 1st October 2024 and run from 7:00am to 5:00pm, Monday to Friday until Friday 15th November 2024.

Our contractor will install a new buried power supply to signals recently installed south of the Dockery’s Road level crossing.  The works will include:

  • Horizontal boring to install a buried conduit.
  • Installation of new pits and power connection cabinet, and
  • Establishment of a site office at the Dockery’s Road level crossing.

How could this work affect you?

There will be vehicle and plant equipment movements, with associated vehicle noise.

Please be assured that we will implement measures to manage and minimise these impacts on the community where possible.

There will be more vehicle movements than normal on Dockery’s Road with workers travelling to and from the site at the beginning and end of the day. Otherwise, there will be 3 or 4 additional truck movements each day.

Temporary signage will safely guide all road users around any changed traffic conditions. Please keep to the speed limits and follow the direction of the traffic controllers and signs where appropriate

For more information, please contact ARTC’s Community Line on 1300 550 402 or community@artc.com.au

Details

Start:
2024-10-01 @ 7:00 am
End:
2024-11-15 @ 5:00 pm
Event Category:

Go to top