Hunter Valley maintenance work
Events
-
-
Level crossing upgrade: Turanville Road, Scone, NSW – April to late 2026
Australian Rail Track Corporation (ARTC) is upgrading the Turanville Road level crossing in Scone to improve safety for the community, road and rail users. The upgrade will include: Road works on both approaches of the level crossing Minor vegetation clearing New line marking Replacement of steel crossing plates with rubber panels Installation of flashing lights […]
-
Level crossing upgrade: Bylong Valley Way, Sandy Hollow, NSW – September 2026 to February 2027
Australian Rail Track Corporation (ARTC) is upgrading the Bylong Valley Way level crossing in Sandy Hollow to improve safety for road and rail users. The upgrade will include: Installation of boom gates Upgraded flashing lights and warning bells Minor road works and new line marking on both approaches Demolition works Signalling upgrades. Work at the […]
-
Hunter Valley Maintenance Closedown: Islington to Ulan and Narrabri, NSW – 17 to 20 November 2026
We will be carrying out essential track maintenance in November at multiple locations between Islington, Ulan and Narrabri, NSW. Work will start from 6:30am Tuesday 17 November and finish at 6:30am Friday 20 November. There will be nightworks at some locations. We will begin minor preparation work and material deliveries in the lead up to […]
-
Level crossing closure: White Street, Blandford NSW – 18 November 2026
Australian Rail Track Corporation (ARTC) will be carrying out maintenance at the White Street Level Crossing in Blandford to maintain a safe and reliable rail network. This work is scheduled from 4:00pm to 9:00pm on Wednesday 18 November. For safety reasons, the crossing will be closed to all traffic for the full duration of the […]

