- This event has passed.
Hunter Valley Network: Routine Rail Maintenance Islington to Telarah
2021-03-13 - 2021-03-14
The Hunter Valley network will undergo routine maintenance works as part of a scheduled shutdown of the network. Works will commence Saturday 13 March to Sunday 14 March 2021. The works will take place across various areas within the rail corridor between Islington to Telarah.
Works across the network will include track reconditioning and resurfacing, rail replacement, road and pedestrian level crossing improvements, rail bridge repairs and testing, ballast cleaning, vegetation control, rail corridor tidy-up work and signal maintenance.
Some noise, dust and road impacts will be associated with the works. We apologise for any disruption or inconvenience caused and thank the community for its support and patience while these essential works are taking place.
The maintenance and improvement work in these scheduled shutdowns is critical to the on-going safety and reliability of the rail network.
Please note: times displayed are indicative of the entire network and can vary by project and location. If you would like to know more about upcoming works in your area please contact Enviroline on 1300 550 402 or email us at enviroline@ARTC.com.au