Urgent repair work: Picton NSW

Australian Rail Track Corporation (ARTC) will be carrying out emergency track repairs following rain damage to an embankment in Picton which has caused significant damage to the track. Work will […]

Sleeper replacement work – Bethungra NSW

Australian Rail Track Corporation (ARTC) will be carrying out scheduled resleepering works in the rail yard at Bethungra NSW from 6:00am to 6:00pm daily from Tuesday 26 April through until […]

Track strengthening work – Paterson to Monkerai NSW

Australian Rail Track Corporation (ARTC) will be carrying out track strengthening work at the following locations between Sunday 1 May and Thursday 5 May 2022: Paterson Martins Creek Dungog Dungog […]

Trackwork – Campsie to Cooks River

The Interstate Network will undergo essential track maintenance and improvement works at several locations between Campsie and Cooks River including works at Enfield, Campsie and Belmore from 7:00am to 7:00pm […]

Bridge works – Flood Road, Josephville QLD

Australian Rail Track Corporation will be carrying out maintenance work on the Flood Road bridge in Josephville QLD from Monday 9 May until Sunday 22 May 2022 between the hours […]

Track maintenance work – Chullora to Berrima NSW

The interstate network will undergo essential maintenance works at various locations between Chullora and Berrima NSW as part of a scheduled shutdown. Works will commence Friday 13 May and continue through […]

Track machine work – Junee to Albury – June 2022

ARTC continually operates track machines across the network to improve track conditions and allow safer, more reliable, and quieter rail operations. A rail grinding machine will be operating between Junee […]

Go to top