Hunter Valley Network: Routine Rail Maintenance Hamilton to Maitland

Hunter Valley coal network NSW, Australia

The Hunter Valley network will undertake routine rail maintenance works starting 3am Saturday 18th August and finishing at 9pm Sunday 19th August. The works will take place across various areas within […]

NSW Super Possession

This is the major annual possession between Sydney to Albury from the 31st of August to the 3rd of September. Various works will occur across the network which include major rerailing, […]

Hunter Valley Rail Grinding: Murrurundi – Willow Tree

Hunter Valley coal network NSW, Australia

Rail Grinding will be undertaken in the Hunter Valley between Murrurundi to Willow Tree during 13 to 15 September, 2018. Rail grinding is a critical process to make sure tracks […]

Hunter Valley Rail Grinding: Ulan Line

Rail Grinding will be undertaken in the Hunter Valley between Bylong and Yarrawa during 16th to 20th September, 2018. Rail grinding is a critical process to make sure tracks stay safe. […]

Hunter Valley Maintenance Shutdown (NSW)

Hunter Valley coal network NSW, Australia

The Hunter Valley network will undergo major maintenance works as part of a scheduled shutdown of the network. Works across the network will include track reconditioning and resurfacing, rail replacement, […]

Hunter Valley Track Machine Works: Sandgate to Maitland, NSW

Hunter Valley coal network NSW, Australia

This is to provide information specifically about track machines operating in the Hunter Valley (tamping, grinding and milling). Track Machines will be working on the Up and Down Coal lines from […]

Ballast Cleaning Works: Tamrookum to Acacia Ridge Qld

Acacia Ridge, QLD QLD, Australia

Shoulder Ballast Cleaning will be performed by ARTC’s Shoulder Ballast Cleaner track machine which picks up existing ballast from the track, cleans the ballast and returns the clean ballast to […]

Ballast Cleaning Works: Tamrookum to Acacia Ridge Qld

Acacia Ridge, QLD QLD, Australia

Shoulder Ballast Cleaning will be performed by ARTC’s Shoulder Ballast Cleaner track machine which picks up existing ballast from the track, cleans the ballast and returns the clean ballast to […]

Hunter Valley Network: Routine Rail Maintenance Hamilton to Maitland

Hunter Valley coal network NSW, Australia

The Hunter Valley network will undertake routine rail maintenance works starting 3.00am Saturday 13th October and finishing at 1am Monday 15th October. The works will take place across various areas within the rail […]

Go to top